1. Pr
  2. > >
See Legal Notices for important information on the climate-related content on this website.

slot demo pragmatic play

A leader in responsible energy infrastructure

With one of North America&demo slot pragmaticrsquo;s largest energy infrastructure portfolios, no one powers day-to-day life like TC Energy. We share technical, stakeholder and operating expertise across all of our operations.

Our Energy Solutions aim to leverage the size and scale of our energy network and trading platform to be the most trusted and reliable source of low carbon energy for the North American industrial, oil and natural gas sectors.

Pragmatic Play
ENERGY SOLUTIONS

Positioned to be the most trusted and reliable resource of low carbon energy for North America’s industrial, oil and natural gas sectors.
pragmatic pl

pragmatic play slot
NATURAL GAS

93,300 km (57,900 miles) of pipeline and more than 653 billion cubic feet (Bcf) of natural gas storage in Canada, the U.S. and Mexico.
demo slot pr

demo slot pragmatic
OIL & LIQUIDS

4,900-km (3,000-mile) pipeline network supplying Alberta crude oil to U.S. markets in Illinois, Oklahoma, Texas and the U.S. Gulf Coast.
Pragmatic Pl

slot demo pragmatic play
POWER & STORAGE

Investments in seven power-generation facilities with a capacity of 4,300 megawatts, enough to power more than four million homes.
Pragmatic Pl

TransCanada-Operations-contentpanel.jpg

Asset map

When the heat goes on in Edmonton, lights turn on in Arizona, or a family buys gas in Guadalajara, TC Energy is there. Explore our pipelines and facilities across North America.

 

View asset map

demo slot pragmatic

Sorry, there were no results.

24x7 Carbon-Free Power Solution

TC Energy offers a first-of-its-kind 24x7 Carbon-Free power product in the province of Alberta, positioning customers to manage hourly power needs with cost certainty AND achieve decarbonization goals by sourcing power from emissions-free assets.

slot pragm

Alberta Carbon Grid

The Alberta Carbon Grid (ACG) is a carbon transportation system reaching the province’s largest sources of industrial emissions. Designed to pragmatic play slotbe an open-access system, the ACG will serve as the backbone of Alberta’s emerging carbon capture utilization and storage (CCUS) industry, connecting the Fort McMurray region, the Alberta Industrial Heartland, and the Drayton Valley region to key sequestration locations and delivery points across the province, and serving multiple industries. When fully constructed, the system will be capable of transporting more than 20 million tonnes of carbon dioxide (CO2) annually.

demo slot

Alberta Power Marketing

In total, TC Energy manages, operates and markets close to 450 megawatts (MW) of electricity in the Alberta. TC Energy is directly involved in all facets of the Alberta power market with expertise in power marketing and trading, generation development, retail services (billing and load settlement) and regulatory issues.

pragmatic

ANR Pipeline

With access to major producing basins in North America, the ANR system transports natural gas from Texas, Oklahoma and Louisiana to cities and towns in Wisconsin, Michigan, Illinois and Ohio.

slot pragm

ANR Storage

Supporting the ANR Pipeline system and ready to serve Midwestern communities, the ANR Storage fields have a combined maximum working storage capacity of 57 billion cubic feet of natural gas.

pragmatic

Bear Creek Cogeneration Plant

Located in the community of Grande Prairie, Alberta, Bear Creek Cogeneration Plant produces up to 100 megawatts of electricity to both Weyerhaeuser’s Grande Prairie Pulp and Sawmill and Alberta’s competitive electricity market.

slot demo

Bécancour Cogeneration Plant

The Bécancour Power Plant is a 550 MW cogeneration facility located in Bécancour, Quebec. It can supply electricity to Hydro-Québec Distribution to meet electricity demands in the province of Québec and provides a source of steam for a neighbouring company in the industrial park.

pragmatic

pragmatic play slotBison Pipeline

The pragmatic play slotBison Pipeline stretches 302 miles (486 km) across Wyoming and Montana to North Dakota, where it connects with another interstate natural gas pipeline.

slot pragm

Bison XPress Project

TC Energy’s 1,412-mile (2,272-km) Northern Border Pipeline Company (NBPL) connects natural gas reserves in the Western Canada Sedimentary Basin with consumers in the Midwestern U.S. as well as receives and transports U.S.-produced natural gas.

slot pragm

Blackrod Connection Project

The Blackrod Connection Project is designed to provide both liquids and natural gas transportation infrastructure to support International Petroleum Corp.’s (IPC) Blackrod Project. TC Energy is proposing to develop and build a liquids pipeline and associated facilities from IPC’s proposed Blackrod Steam Assisted Gravity Drainage (SAGD) facility to the existing Grand Rapids Pipeline (GRP) System, ~45 kilometres (km) north of Wandering River, Alberta

demo slot